Smart Glass Los Angeles
Smart Film Installation
How our Los Angeles crew installs PriWatt™ smart film and smart glass — from measuring and wiring to the final switch-on.
Two ways to install
Film on existing glass, or new smart glass.
Existing glassSmart film installation
Our certified Los Angeles installers apply PriWatt™ self-adhesive film to interior glass, sliding doors, and exterior windows and doors — no glass replacement.
- Glass conditionMust be spotless — even a tiny flaw can leave a bubble
- WiringConnection points planned before the film is cut
- Typical timelineMost LA projects installed in a single day
New openingsSmart glass installation
PriWatt™ laminated smart glass is set like ordinary tempered laminated glass by a glazier, then connected to power by a licensed electrician.
- SupportStep-by-step guide plus phone and video support
- BusbarsPositions and wire routes agreed before manufacturing
- Typical timelineManufactured to size, then installed in one visit
On site. Hands on. Accountable.
What happens on your site.

Talk to an expert. Get your quote.
Tell us about your space and we help you choose the right film or glass — then you get a clear estimate within 24 hours, with a working sample if you want to see it first.

Every opening, checked.
We review your plans or your existing glass one opening at a time: sizes, glass type, where the power goes and how you want to switch it — then one quote covers it all.

Installed by our own team.
Our certified Los Angeles installers fit the film or glass, connect the power and controls, and test every panel with you before we leave the site.
Watch the install
See a smart film install from start to finish.
This video walks through a complete PriWatt™ film installation — cleaning, placing the film, connecting the power and the first switch from clear to private.
Before we start
Measuring for smart film.
Measure the visible glass
Send us the width and height of the visible glass area. We confirm the pre-wiring location once your order is placed.
Leave a 1/8″ gap
The film is cut 1/8″ (3.175 mm) smaller than the glass on every side so it never touches the frame.
Plan the power
Contact strips and leads must never touch metal frames or trim. We plan the route to a transformer, switch or controller.
Step by step
How the film goes on.
Step 01
Clean, then clean again
Wash the glass and the space around it until there is no dust at all. Dust under the film is what causes bubbles.
Step 02
Peel and place
Lift 20–30 mm of the liner from the adhesive side, position the film and work across with a vinyl squeegee as you peel.
Step 03
No water, no chemicals
The film bonds with an electrostatic adhesive layer. Water or chemicals damage it, so the install is completely dry.
Step 04
Connect and solder
Solder the wires to the copper connectors, then remove the protective layer from the outer face of the film.
Step 05
Seal the edges
Insulate the connectors and run a thin bead of non-conductive silicone or 3M tape along the edges to prevent delamination.
Step 06
Test with you
We switch every panel on and off with you and follow the wiring diagram supplied with your order before hand-over.
Equipment
What our crew brings.
- Window scraper or razor
- Nitrile gloves
- Glass cleaner
- Isopropyl alcohol
- Microfiber towels
- Squeegee
- Neutral glass silicone (Silglaze or similar)
- 18-gauge electrical wire
- Wire stripper
- Soldering iron and lead-free solder
- Non-conductive trim
- Liquid glass polish (optional)
FAQ
Installation questions
How long does a smart film installation take in Los Angeles?
Most homes and offices are finished in a day. Larger commercial jobs are scheduled in phases around your business hours.
Do I need an electrician?
For hard-wired systems, yes — a licensed electrician makes the final power connection. Our crew coordinates that for you.
Can I install smart film myself?
We don't recommend it. Warranties are void if film is cut or trimmed by anyone other than an authorized installer, so professional installation protects your investment.
What happens if the glass gets wet or very hot?
Wet-glazed or sun-exposed installations need sealed edges and, for strong direct sun, Low-E glass. We assess this on the site visit.
Local installation · Los Angeles
Ready to schedule your install?
Send your measurements and we reply with a quote and install date within 24 hours.
Get an estimate